Oct,08

IEC 62888-5:2018 pdf download

IEC 62888-5:2018 pdf download

IEC 62888-5:2018 pdf download.Railway applications – Energy measurement on board trains – Part 5: Conformance test
1 Scope
This part of IEC 62888 specifies the conformance test arrangements for newly manufactured EMS installed on a traction unit. This includes the integration conformance test and installation conformance test. In addition, this document also specifies the conformance test procedures for device and ancillary component replacement (e.g. due to damage in service), and periodic check to verify the EMS conformance test remains valid. The assessment methods d) to j) in 4.3 apply at EMS system level. The methods are covered by IEC 62888-5 for Level 1 and by IEC 62888-6 for Level 2 and Level 3. This document does not include elements related to conformance test aspects other than design review and testing provisions for the products, processes or services specified. Consequently, this document does not delete, change or interpret the general requirements for conformance test procedures and vocabulary detailed in ISO/IEC 1 7000. This document does not cover the conformity assessment schemes that are the responsibility of ISO policy committee “Committee on conformity assessment” (ISO/CASCO).
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes requirements of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. IEC 60571 :201 2, Railway applications – Electronic equipment used on rolling stock IEC 62888-1 :201 8, Railway applications – Energy measurement on board trains – Part 1: General IEC 62888-2:201 8, Railway applications – Energy measurement on board trains – Part 2: Energy measurement IEC 62888-3:201 8, Railway applications – Energy measurement on board trains – Part 3: Data handling IEC 62888-4:201 8, Railway applications – Energy measurement on board trains – Part 4: Communication IEC 62888-6:201 8, Railway applications – Energy measurement on board trains – Part 6: Requirements for purposes other than billing
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions For the purposes of document, the terms and definitions given in IEC 62888-1 :201 8 and the following apply. ISO and IEC maintain terminological databases for use in standardization at the following addresses: • IEC Electropedia: available at http://www.electropedia.org/ • ISO Online browsing platform: available at http://www.iso.org/obp 3.1 .1 conformance test demonstration that specified requirements are fulfilled 3.1 .2 conformance test folder CTF folder holding all documentation produced during conformance test 3.1 .3 EMS installation installation of an EMS equipment type into a traction unit of a specified type 3.1 .4 EMS integration integration of devices, interconnections and ancillary components, forming a specific EMS equipment type 3.1 .5 Implementation Under Assessment IUA specific EMS equipment type used throughout the conformance test 3.1 .6 installer entity responsible for the installation of an EMS equipment type into a traction unit type 3.1 .7 EMS integrator entity responsible for integrating devices, interconnections and ancillary components, forming an EMS equipment type 3.1 .8 periodic re-verification activities carried out periodically to check that the conformance test of an in-service EMS remains valid Note 1 to entry: These re-verification activities are solely for the purpose stated, consequently other in-service activities such as maintenance and fault finding, etc., are not covered by this term. 3.1 .9 protective interface interface which permits intended data to be exchanged, and prevents unintended data being exchanged 2
4 Conformance test approach
4.1 General This clause specifies the structure and methodology for the conformance test. The procedures, design review requirements, testing requirements, and conformance test documentation requirements are specified in Clause 5. Completion of devices level conformance test is a pre-requisite to carry out EMS conformance test. The conformance test is undertaken in the following key stages: a) device level; b) EMS level; c) EMS re-verification and device / ancillary component replacement. Stage 1 is mandatory for newly manufactured devices and is covered by IEC 62888-2, IEC 62888-3 and IEC 62888-4. Stages 2, 3 are mandatory for every EMS in accordance with the scope as specified in Clause 1 . The conformance test, undertaken during stages 2 and 3, deals primarily with system level requirements, and it does not replicate the detail in stage 1 .

Download
The previous

IEC 62828-2:2017 pdf download

The next

IEC 62881:2018 pdf download

Related Standards